Contractor Jerry Spears performed structural repairs to Fog Signal Building, replacing rotted structural members in the roof and improved support to the chimneys
A corrugated steel over-roof was installed on the Fog Signal Building
Selectively replaced wood and external steel on the Fog Signal Building’s north wall and soffit
Painted replacement steel siding and soffit to blend with existing material
Mihm Enterprises repaired leaks around Assistant Keeper’s chimneys and performed an assessment of the roof, making replacement recommendations and cost estimates
Completed the brick façade around the “lean to” foundation, adding screened vents to ensure air circulation
Added “trap door” to make the crawl space accessible
Repaired the deteriorating step at the rear of the lighthouse
Created replica trim material to trim “lean to” doors and windows inside and out, making the second double-hung window functional