2007 Restoration Activities
Boathouse
- Partially cleared building, adjacent pier, and walkways of rock
- Trued and stabilized structure with two temporary interior shear walls
- Replaced rotted roof boards
- Realigned southern wall
Oil House
- Painted roof and door
- Painted brick walls white
Workshop
- Cleared building of surrounding brush
- Painted exterior walls with priming coat of white paint
- Cleared interior of leave
- Replaced rotted front door threshold
- Re-caulked window panes
- Completed temporary roof repairs
Fog Signal Building
- Replaced two broken window panes on the main floor
- Reinforced upper story door to the former catwalk to the Skeletal Tower
Skeletal Tower
- Cleared base of thick brush
- Gained access to entrance level using an extension ladder
- Assessed structure condition
- Prepared infrastructure for Webcam in lantern room
More of these early activities are further documented here.