2007 Restoration Activities

Boathouse

  • Partially cleared building, adjacent pier, and walkways of rock
  • Trued and stabilized structure with two temporary interior shear walls
  • Replaced rotted roof boards
  • Realigned southern wall

Oil House

  • Painted roof and door
  • Painted brick walls white

Workshop

  • Cleared building of surrounding brush
  • Painted exterior walls with priming coat of white paint
  • Cleared interior of leave
  • Replaced rotted front door threshold
  • Re-caulked window panes
  • Completed temporary roof repairs

Fog Signal Building

  • Replaced two broken window panes on the main floor
  • Reinforced upper story door to the former catwalk to the Skeletal Tower

Skeletal Tower

  • Cleared base of thick brush
  • Gained access to entrance level using an extension ladder
  • Assessed structure condition
  • Prepared infrastructure for Webcam in lantern room

More of these early activities are further documented here.